The Draco team setting up the concrete mix for constructing the concrete slab around the borehole
Village residents participating actively in the mixing of the concrete mix and helping in the construction of the slab
The 8 pipes that were installed in the borehole
Installation of pipes into kitukiro borehole
Setting up the head assembly of the borehole
Women showing excitement as the team pumped the first water out of the borehole
Final stages of the concrete mix and the construction of the slab
Residents dancing and jubilating during the installation process
Women and men observing carefully as the team finishes the last touches of the borehole installation