Water Sanitation and Hygiene - Kisiro - Namutumba

Visit by Alex Walyomu on 2019-09-30

Report ID
6878
Created by
Alex Walyomu
Created date
2019-10-01 09:18:10 UTC
Modified by
Ben West
Modified date
2019-10-01 15:55:43 UTC
Trip Time
22:28-17:35 (-5 h 7 m)
Village Time
13:09-15:50 (2 h 41 m)
Travel Time
-8 h 26 m

Water Community Meeting

Meeting Topic
user committee training,roles and responsibilities 
How Many Men Attended
How Many Women Attended
Staff Attendees
David Balimunsi,Walyomu Alex 
Government Attendess
LC1,LC2,VHT 
Visitor Attendees
 
Total Attendance
Look Up
 
Notes
Both David and Alex were in Kisiro to meet with the water user committee and held a discussion about their roles and responsibilities during this period of the borehole survey and drilling. The water user committee has to go through their roles and responsibilities to make sure that this whole tedious period of borehole survey and drilling goes on smoothly. This committee has a big task of spear heading this process and has a responsibility to bring all the village together making sure that no one develops selfish ambitions thinking that a borehole can be drilled anywhere someone might want. The water user committee is supposed to work together making sure that they come up with ways of how they have to feed the workers and ensuring that all the people are on board to support this process. Also the water user committee was told that they have to play a role to ensure that all the money needed to be contributed amounting to 300,000/= per well is available and in this case, this village has to raise 600,000/= for both boreholes that are expected to be drilled in Kisiro. The water user committee was reminded that Kibo group won’t be on ground to make sure all things move as expected but only rely so much on them. The water user committee was very happy that the community entrusted them with this responsibility and the chairperson Mutesi Saina was happy to report to Alex and David that her committee was very ready to take up all the responsibilities before them and told Alex not to worry as everything would go on smoothly. Alex will go back for another village meeting with all the people to continue preparing them before the borehole survey. Kibo group has to strongly discourage the people not to divide themselves and fight for where the borehole can be drilled but rather leave the hydrogeologist do his job very well. Two days ago, there was another bad storm in the village and on a very sad note, many individuals lost their buildings with iron sheets being blown away by the storm. They visited all the people that lost their property and encouraged them. Also some people including the village leader in Kisiro central had completed a new pit latrine. 
Next Visit
2019-10-04 - Purpose: To have a general meeting with the village and continue preparing everyone through the community roles and responsibilities
Program Success
There is a great community cooperation and all working together to reach their heights
Program Critical Needs
The community is now working together to prepare themselves for borehole survey and drilling
Program Ownership
The water committee that was recently selected by the village is working together to prepare the village before the well survey and drilling
Other Program Observations
The sanitation and hygiene facilities facilities like pit latrines are reconstructed whenever they breakdown by many people
Program Expected Of Village
The village to continue working together to prepare themselves very well before the borehole survey and drilling
Program Staff Preparations Next Visit
Call the water user committee to remind them to mobilize the village for a meeting
 