Water Sanitation and Hygiene - Naibowa - Kamuli

Visit by Alex Walyomu on 2020-07-24

Report ID
9433
Created by
Alex Walyomu
Created date
2020-07-26 08:25:11 UTC
Modified by
Alex Walyomu
Modified date
2020-07-26 09:16:10 UTC
Trip Time
09:36-18:55 (9 h 19 m)
Village Time
11:49-16:07 (4 h 18 m)
Travel Time
5 h 1 m

Water Community Meeting

Meeting Topic
drilling 
How Many Men Attended
32 
How Many Women Attended
45 
Staff Attendees
Walyomu Alex 
Government Attendess
LC1,VHT,Parish Chief,Parish Councillor 
Visitor Attendees
 
Total Attendance
77 
Look Up
 
Notes
Alex went back to Naibowa to continue with the supervision of the drilling exercise. The second day of borehole drilling continued and after hitting the first water from 30M, more water was got as drilling continued on 24/07/2020 and 25/ 07 2020. 61M were drilled and an estimated 2500L per hour was got. It’s assumed that this might be more during the pump testing process. Also the water cleared quickly since it was got from a rock. The village people were very happy and danced showing for two days with Joy. The next step will be pump testing and installation expected soon. Alex also checked on the borehole that had been down for more than two years in the upper part of the village(Bufesa section). This borehole was repaired a week ago by a politician who is aspiring for MP seat in this area. The borehole was installed with new pipes, rods, head assembly and water tank. This offloads the burden from kibo because Kibo was preparing to partner with the village this borehole in a near future. The village will be encouraged to build a fence around it and revive the water user committee. 
Next Visit
2020-07-28 - Purpose: Supervision of borehole test pumping and installation process.
Program Success
The drilling was successful
Program Critical Needs
Program Ownership
Other Program Observations
Program Expected Of Village
Continue working together as a village to maintain the water and sanitation standards
Program Staff Preparations Next Visit
To keep in touch with the drilling company and know when the remaining steps are to be done
 

Report Photos

12094 The successful water point after water drilling
12097 61M were drilled and the borehole is estimated to pump 2500L per hour.
12100 The community was very happy seeing the water
12103 The successful water point that was drilled ready for pump testing and installation
12106 Alex visited the borehole that was recently repaired by an aspiring member of parliament. This same borehole had been considered for repair by kibo in partnership with the village but looks like it’s done
12109 The village members jubilated for two days and nights because of the joy.